Installation and working methods of a testing laboratory to establish a private control at the concrete plant (part 1)

Authors

  • F. Haarmann
  • - Andernach

DOI:

https://doi.org/10.3989/mc.1973.v23.i149.1401

Abstract


Not available

Downloads

Download data is not yet available.

Downloads

Published

1973-03-30

How to Cite

Haarmann, F., & Andernach, .-. (1973). Installation and working methods of a testing laboratory to establish a private control at the concrete plant (part 1). Materiales De Construcción, 23(149), 76–84. https://doi.org/10.3989/mc.1973.v23.i149.1401

Issue

Section

Research Articles