[1]
Haarmann, F. and Andernach, .-. 1973. Installation and working methods of a testing laboratory to establish a private control at the concrete plant (part 1). Materiales de Construcción. 23, 149 (Mar. 1973), 76–84. DOI:https://doi.org/10.3989/mc.1973.v23.i149.1401.